V-ER-001 Valuation Engagement and Reliance Block¶
V-ER-001 records the engagement behind a valuation: who instructed it, its addressee and references to terms governing use and reliance. A recipient checks whether it is the named addressee and whether a separate engagement or instrument permits its intended use. The credential describes these arrangements; it does not create professional duties or grant reliance.
Roles¶
Producer: the valuer or firm that agreed the engagement. Receiver: the recipient, which needs to check whether it is the named addressee. Professional duty and terms of engagement sit with the valuer; a credential never grants reliance or establishes professional indemnity (PI) insurance cover. Any applicable cover and permitted reliance must be assessed separately.
Claims and composition¶
Key claims in the property draft (urn:realworld:credential:property-valuation:3): an engagement identifier, the addressee (scheme plus value), and an instruction kind (for example original_instruction). Terms of engagement and any reliance instrument are references only; their content is not restated here.
Rules and timing¶
The engagement exists before the valuation is issued. Reliance is a contractual matter outside the credential; the checker never grants it. Recipient-versus-addressee matching must use the recipient's independently supplied context; enforcement in the reference tools remains incomplete. Disclosure of the engagement block is governed by X-PD-001 Evidence Presentation and Disclosure.
A presentation audience and an engagement addressee answer different questions. Passing a holder-binding or audience check does not establish that this recipient may rely on the valuation. Keep the technical result and recipient acceptance separate.
Example¶
Lender A instructs a valuer (kind original_instruction). The credential names Lender A as addressee. Lender A's verifier confirms that it is the addressee; whether it may rely on the valuation is decided by the engagement terms, not by the credential.
Implementation status¶
The property draft has a schema and signed synthetic fixtures, with internal evaluation rather than independent human assurance. Recipient-context enforcement remains incomplete; addressee_not_recipient is a proposed policy outcome, not an adopted interoperable result code. Restricted-use reports and an assumption of no reinspection cannot yet be expressed. The referenced professional-standard mapping is approximate and unendorsed.